A builder’s ENERGY STAR participation or an efficient appliance does not establish certification for your home. Ask for the address-specific label and verification record.
New Construction
Edmond adds a slab inspection for new residential permits pulled October 1 or later. Check permit timing, pre-pour approval and the records to keep as a buyer.
Building an Oklahoma home? Compare one- and two-closing construction financing, permanent-loan conditions, changed terms and the records needed before conversion.
A passive radon system is not a passing test. Plan new-home testing, review actual results and coordinate follow-up with the Oklahoma purchase calendar.
Before signing for an Oklahoma new home, ask for the insulation information that belongs in the sales contract and match it to the parts of the house being built.
Storm damage before closing calls for more than a repair promise. Review risk of loss, damage records, repair scope and lender requirements for your Oklahoma new home.
Before paying a builder upgrade deposit, put the exact selection, price, refund rule, change deadline and closing treatment in signed documents.
A builder credit is not automatically the lowest-cost mortgage. Compare written Loan Estimates, rate locks, credits, price and closing deadlines on the same assumptions.
For an Oklahoma new home with onsite sewage, verify site-and-soil records, Authorization to Construct, installed-system details and final inspection evidence before closing.
Before closing on an Oklahoma new home, match the permit date, governing code edition, approved plans, inspection results and final approval.