Do not automatically fill small openings in the brick on a new Oklahoma home. Some are intentional weeps that let water leave a brick-veneer wall. Ask the builder to identify the wall system, intended drainage openings and any actual defects before a handyman seals gaps or landscaping covers them.
An opening is not proof that the wall was built correctly, and a visible gap is not automatically a defect. The useful handover task is to document what is present and obtain a property-specific explanation from qualified people.
Ask which wall assembly you are looking at
Brick veneer is not simply a waterproof outer shell. The Brick Industry Association describes anchored veneer over wood framing as an assembly with an air space, flashing and drainage openings. Its Technical Note 28 explains how those parts work together.
Ask the builder whether that description fits your wall. Thin adhered brick, solid masonry and other assemblies can have different details. Do not use a photograph from another house as the inspection standard. Request the relevant plans or construction detail and identify who can explain the installed system. A clear answer is more useful than a general assurance that all new homes are built the same way.
Identify intentional openings before making a punchlist
Walk the exterior with the builder or inspector and ask them to point out the drainage openings associated with the flashing. Take safe, ground-level photographs showing both the opening and its location on the wall. Note which side of the home is pictured so a later trade visit goes to the right place.
Write separate questions for an intended opening, a blocked opening, missing mortar or a crack. Those are not interchangeable descriptions. The BIA guidance explains that weeps discharge water above flashing and that appropriate screens can be used in some designs. A suitable component that preserves drainage is different from filling an opening with foam, caulk or mortar.

Resolve water concerns without an improvised repair
If you see staining, damp interior finishes or another sign of water entry, report the actual observation and when it occurred. Ask for diagnosis of the wall assembly rather than ordering a coating simply because the outside brick gets wet.
BIA’s maintenance guidance discusses drainage walls and the role of flashing, joints and other components. Applying a surface treatment does not prove that hidden drainage is correct. Do not drill new holes, remove brick or probe deeply behind the veneer as a do-it-yourself test. Ask a qualified inspector or masonry professional to recommend the investigation and any repair appropriate to the specific construction.
Coordinate the landscape handover
For a new home in the Oklahoma City metro, the final exterior may still be changing as sod, planting beds, edging or paving are installed. Before approving an added flower bed, show the landscaper the builder’s documented drainage details. Ask whether the proposed finished level leaves the intended openings and clearances functioning.
Keep the answer in the home file along with photographs taken before and after the landscape work. Do not rely on a generic clearance measurement from an unrelated wall design. The purpose is to coordinate trades so that a finishing task does not undo another part of the assembly. The same care applies when a future contractor offers to seal visible gaps for pest control.

Put unresolved work into the contract process
A handover observation should have a location, description, requested explanation, responsible person and follow-up date. If the builder proposes a correction, obtain the scope in writing and ask how completion will be verified. Separate a cosmetic preference from a performance concern identified by the inspector.
The OREC New Home Construction Contract is a useful reference, but your signed contract controls the inspection and repair process. This guide does not create a right to delay closing or guarantee warranty coverage. Discuss unresolved concerns with your real-estate team and appropriate professionals while the contract’s options and deadlines can still be evaluated.
Keep a maintenance record after moving in
Save the wall-system explanation, builder correspondence, relevant inspection notes and completion photographs. Give future painters, landscapers and pest-control contractors the specific instructions before work begins. If an opening looks different later, compare it with the handover record instead of guessing why it changed.
Our flooring moisture-record guide addresses a separate indoor installation decision. A flooring check does not verify brick drainage, and a brick review does not verify flooring conditions. Doug and Ronnie at OKC Metro Group can help organize the new-home questions so the builder and specialists can answer each one clearly. Start by asking the builder to label the intended openings before anyone tries to make the wall look more finished.
For the broader housing plan, explore our OKC metro new-construction guidance. Related guidance: First-Freeze Preparation at an Oklahoma New-Home Handover.